Abstract
In this article a method is developed for optimizing the work share between dozers and excavators in the excavation work of polluted soil Experiences are implemented in order to both validate hypothesis and set relations between measurable physical parameters like the overlay between lines or the maximal line length and excavation efficiency In the final part of the article the author shows how work share between machines can be optimized by using calculations on the appropriate parameters in a calculation sheet and parameterizing a solver tool![Creative Commons License](http://i.creativecommons.org/l/by/4.0/88x31.png)
This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright (c) 2017 Authors and Global Journals Private Limited